Skip to main content

PSEG Will Not Build Substation in Hither Woods

Tue, 06/25/2019 - 14:55
PSEG Long Island will build a new electrical substation for Montauk on a Long Island Power Authority-owned parcel on Shore Road (outlined in turquoise), near the site of the present substation on Fort Pond.

East Hampton Town Supervisor Peter Van Scoyoc announced on Tuesday that PSEG Long Island, which has been exploring alternative sites for an updated electrical substation to replace one on Industrial Road in Montauk, will abandon a proposed site in Hither Woods and build a new substation on a Long Island Power Authority-owned parcel on Shore Road, near the site of the present facility. 

Mr. Van Scoyoc secured the utility's agreement to locate the substation in an industrial area during a conference call on Monday, according to a press release from his office. 

The East Hampton Trails Preservation Society announced its opposition to the Hither Woods site last week, complaining that a substation there would be directly beside, if not atop, the 125-mile long Paumanok Path. The utility, which manages the electrical grid on behalf of LIPA, had earlier abandoned proposed sites in Eddie Ecker Park and off Flamingo Avenue in Montauk, after residential property owners in the vicinity campaigned against it. A group calling itself Montauk United said that siting a substation off Flamingo Avenue had the potential of "becoming one of the greatest ongoing manmade calamities in the history of Montauk."

The existing substation is 101 years old and sits on a manmade site that juts into Fort Pond along the low-lying Industrial Road. A 2017 siting analysis prepared by PSEG Long Island noted that it is approximately five feet above mean sea level, one to two feet above the elevation of Fort Pond, and experiences regular flooding, which has deteriorated the infrastructure. 

The utility analyzed approximately a dozen vacant properties. Few were deemed viable in terms of size, proximity to electrical infrastructure, land-use designation, or other considerations such as the presence of wetlands. Property near Montauk's former landfill became a popular option among many of the hamlet's residents, but the area is parkland, and a substation there would require approval of county and state legislatures for parkland alienation. It would also have required significant clearing and is farther from the grid than other proposed sites.

Although Mr. Van Scoyoc had previously described the site north of the former landfill as "more sustainable and resilient, given its higher elevation," he said in the press release on Tuesday, "I cannot support the alienation of parkland near the Paumanok Path. . . . Like so many residents who have written to me to oppose the industrialization of this area, I want to see this area remain pristine and protected." 

After a review, PSEG Long Island chose a parcel on Shore Road that is at a higher elevation than the current site, though like the existing substation it is also in a floodplain. To better protect the substation infrastructure on the Shore Road site, which is adjacent to the location of an energy storage battery facility, PSEG Long Island will raise the level of both the substation equipment and of the road, and install drainage structures in order to alleviate persistent flooding in the vicinity. In addition, it will screen the equipment from sight. The existing substation will be dismantled, and PSEG Long Island and the town will restore the site, allowing for the public's use of the waterfront and access to the pond, according to the press release. 

"I applaud PSEG Long Island for responding to my request to engage with the community and work cooperatively to find an acceptable location for the electrical infrastructure needed in Montauk," Mr. Van Scoyoc said. 

Elizabeth Flagler, PSEG Long Island’s head of external communications, said in an email on Tuesday that "PSEG Long Island worked with the town's supervisor and leaders, listened to the concerns of the community, and is pleased to have found an agreed upon location that will support the energy requirements of Montauk."

 

Your support for The East Hampton Star helps us deliver the news, arts, and community information you need. Whether you are an online subscriber, get the paper in the mail, delivered to your door in Manhattan, or are just passing through, every reader counts. We value you for being part of The Star family.

Your subscription to The Star does more than get you great arts, news, sports, and outdoors stories. It makes everything we do possible.